| 1. | The road between kong sham western highway and shenzhen bay port ; and 介乎港深西部公路与深圳湾口岸之间的道路;及 |
| 2. | I ' m a driver on the western highway from the mountains into the sea 行驶在西部的高速公路上,我想的只是离开这里,去看看海。 |
| 3. | The engineering geological problems of expansive soil in western highway construction 中国西部公路建设中膨胀土工程地质问题的初步研究 |
| 4. | The slip road leading from ha tsuen interchange to the northbound carriageway of kong sham western highway 由厦村交汇处通往港深西部公路的北行车路的支路; |
| 5. | Speed limit on kong sham western highway , and the road between kong sham western highway and shenzhen bay port 港深西部公路及介乎港深西部公路与深圳湾口岸之间的道路车速限制 |
| 6. | Kong sham western highway from a point about 150 metres south of its junction with ha tsuen interchange to its connection with the road between kong sham western highway and shenzhen bay port 其与介乎港深西部公路与深圳湾口岸之间的道路的连接处止的路段; |
| 7. | But we must aware , along with process of western region developing , the western highway construction also expose the obvious problems , these problems block the process of developing the western part seriously . therefore we must take effective methods to solve the problems , so that we can make the development of the western part successfully 但是,我们必须看到,随着西部大开发进程的推进,西部公路建设也暴露出较为突出的问题,这些问题正严重制约着西部的发展,阻碍了西部大开发的进程,因此,我们必须采取有效措施,解决问题,使西部大开发顺利地实施。 |